End customer: TCDD
Project:
Point heater systems in the high speed Ankara-Konya line
Scope:
Design, Engineering, software development, assembly, installation and supervision as well as after-sales support for point heater systems
Other details of interest:
Transmission of the state of the installations to the central energy command post by means of the Mo protocol
Monitoring and control of the state of the installations by means of a protocol module via GSM modem for maintenance